Clean Power

Deutsch (DE-CH-AT)English (United Kingdom)

Dienstleistungen_940_300

Terminal
Public handling and interim storage of loading units (LU)

Infrastructure:
  • 3 Handling rails with 2 gantry cranes of 620m length (Module 10)
  • 4 Handling rails with 2 gantry cranes of 564m length (Modul 20)
  • 7 rails of 800m length each for the siding of trains after/before loading procedure
  • Siding lanes with a length of 2928m

Plant capacity:
  • Loading and Unloading up to 38 trains per day
  • Handling of up to 300,000 loading units p.a.
  • Siding of up to 1,200 TEU (=20´Container units)

Services:
  • Transshipment road/rail, rail/rail and road/road
  • Interim storage of empty and full loading units (ex. bulk containers up to 20´- 45´,
  • Also swap type; box container 20´- 45´. Swap-bodies7.15 – 7.82m, trailers up to 13.60m, also megatrailers) with EDP siding management
  • Control of loading units with DP aided Check in and Check out system
  • Further services upon request

Your partner in questions about handling is Mr Probst –> Contact Us